fighting procrastination fifteen minutes at a time

Category: 2mmFS

Once again…..

Ok, so this time I looked it wasn’t so bad in the length of time since my last posting to my blog though no physical work has taken place since then mainly due to a move of house that took some doing. However on the plus side I now have a dedicated, warm and comfortable space to inhabit and model. I will add more detail about space and plans in future posts as I am still wrestling with a ton of home chores including build my own bed and a stack of book shelving. So that in turn leads to other ‘dependencies’ in the works i.e. clear out the garage to make space for the tools that making things with are needed then that will lead on to works starting on the railway front. Well that’s the plan.

I am quite excited as I have a space of around six foot six inches, so a typical shelf layout space however I have some ideas for this to help combat my attention span deficit. Then there is the work bench that needs to be planned and as this is a multifunctional space it is going to need to accommodate a computer space too, more of that story later.

This spurt of effort comes about from attending the NEAG35 meeting for the NE Area Group of the 2mm Finescale Association, to mark 35 years of their illustrious group. I met up with the guys from the group I use to be in when I lived in London and got to see their layout fully operational for the first time. I can only claim to have soldered a couple of wires in the control panel but it is a truly great layout in many ways but not least for the architectural modelling and a really talented bunch of modellers they are. For more and better pictures take a look at their blog as I was too busy having fun playing trains! Following on from that my friend Richard and I, who was up with the operating team but stayed over for a day, had a day out at the Keighley & Worth Valley Railway where they were part of a 1940’s weekend. The railway had taken on the appearance of one at war and there were loads of people dressed in period clothing seemingly taking it really seriously. This as a roundabout and longwinded way of saying I came away inspired and ready to fire up 15minutemodeller again and to actually achieve something.

So the mean time I will leave you with a couple of pics from last weekend and will start put down plans and progress, though typically Summer has come to this corner of the world and the desire to be outside may outweigh the need to model 😀

 

P1080564.jpeg

P1060730.jpeg

Back on the Wagon

After a rather too long a hiatus in modelling terms due to life getting in the way I have managed to get back to the workspace. Yesterday I attended the NEAG meet that was primarily for getting people building and most of us built a 2mmFS Mineral Wagon kit and had the challenge to complete it by the end of the day. I didn’t get off to a good start by forgetting my soldering iron (I have at least 5 with the temp controlled one I was going to take got out ready the night before, and a craft knife) Thankfully one was provided for me and I cadged off my fellow AG member for the knife. It also realised/remembered that there are all sorts of little jigs and things like Blutac and hair clips. I have also been thinking about toolbox build and adapting it to my needs. I therefore haven’t moved ahead with this yet but I have make contact with local timber merchants who will supply and cut good quality Birch Ply along with carcassing timber for another project.

Unfortunately I didn’t manage to get that far but I certainly managed to get a good way on with it. The boost it provided has got be back to getting on with my modelling and certainly will keep momentum going as I got another kit to bring home with me to start as soon as I have finished the first one. In fact I have a rake of about 15-20 to build of these so once I have completed one to my satisfaction I will start batch processing.

This leads me on to what to run these on. Well I am going to try to build a foam board micro, a kind of inglenook keeping it simple!! but building some things that can be transferred to the ‘big’ layout. But less talking more doing! 🙂

Wagon kit building

Wagon kit building starts

 

 

 

 

 

 

 

 

 

 

Before lunch

Before lunch

 

 

 

 

 

 

 

 

 

Somewhat nearly finished

End of the day