fighting procrastination fifteen minutes at a time

Tag: planning (Page 3 of 3)

The Big Idea.

Although no physical modelling has taken place so far I haven’t been idle and in fact I see  3D modelling to be just as relevant and enjoyable as the real modelling. As I stated in my last post getting to the point where I have a layout space is still someway off and all the prep that need to go into that will take up the majority of my time at the moment. You can see by the picture below that there is an ideal wall space for the shelf layout and IMG_2311.jpegalthough I looked at using the longer wall on the other side of the room but I have deliberately settled for the shorter one as this restricts my natural expansionist tendencies, well at least for the time being. At the moment it is an easier space to convert as well as there are some pretty hefty cupboards around the rest of the room and it would make for storage difficulties due to there being not much else in the house. You may note the mattress on the floor however this will not stay there and once a suitable bed is procured will disappear to the other side of the room. I did ponder a Murphy bed but in the end too much hassle for not much gain.

So this is my blank canvas a where I get to do my modelling and where I need to map out the space requirements. From the window side to the door frame I have 6′ 6″ exactly but I am thinking about having a drop down bridge that would need six inches to allow it to be attached to the wall and braced vertically therefore giving me six feet of useable space. Then comes the basic concept; although not actually modular the structure of the railway(s) will take a similar approach in that the boards will be have a common interface with the fiddle yard or staging and will all be three feet long allowing them to be housed below the running layout in some custom draws that I thought could use the draw front as the back scene once turned round. All this is a concept at the moment and needs to be somewhat tested out.

Screen-Shot-2017-05-28-at-18.48.37.jpeg

Here is the digital mock up and with the frame and brackets I can place the layout height at pretty much anything I like. At the moment I am pondering a eye level sight line and as I don’t see multi-hour marathon operating sessions it would be like having a standing desk, and that gives good separation to the workbench and layout. Many people may say “isn’t this too much effort going into a six foot self layout” but for me playing around with the building block gives me just as much fun.

I’m off to test some things out at build a 1:12 mockup of the room. My findings in the next post.

Once again…..

Ok, so this time I looked it wasn’t so bad in the length of time since my last posting to my blog though no physical work has taken place since then mainly due to a move of house that took some doing. However on the plus side I now have a dedicated, warm and comfortable space to inhabit and model. I will add more detail about space and plans in future posts as I am still wrestling with a ton of home chores including build my own bed and a stack of book shelving. So that in turn leads to other ‘dependencies’ in the works i.e. clear out the garage to make space for the tools that making things with are needed then that will lead on to works starting on the railway front. Well that’s the plan.

I am quite excited as I have a space of around six foot six inches, so a typical shelf layout space however I have some ideas for this to help combat my attention span deficit. Then there is the work bench that needs to be planned and as this is a multifunctional space it is going to need to accommodate a computer space too, more of that story later.

This spurt of effort comes about from attending the NEAG35 meeting for the NE Area Group of the 2mm Finescale Association, to mark 35 years of their illustrious group. I met up with the guys from the group I use to be in when I lived in London and got to see their layout fully operational for the first time. I can only claim to have soldered a couple of wires in the control panel but it is a truly great layout in many ways but not least for the architectural modelling and a really talented bunch of modellers they are. For more and better pictures take a look at their blog as I was too busy having fun playing trains! Following on from that my friend Richard and I, who was up with the operating team but stayed over for a day, had a day out at the Keighley & Worth Valley Railway where they were part of a 1940’s weekend. The railway had taken on the appearance of one at war and there were loads of people dressed in period clothing seemingly taking it really seriously. This as a roundabout and longwinded way of saying I came away inspired and ready to fire up 15minutemodeller again and to actually achieve something.

So the mean time I will leave you with a couple of pics from last weekend and will start put down plans and progress, though typically Summer has come to this corner of the world and the desire to be outside may outweigh the need to model 😀

 

P1080564.jpeg

P1060730.jpeg

First branches

tomusaplan_v3

Following on from yesterday I post my interpretation of the track plan I have been noodling around on back of envelopes over the last few weeks and gives me an idea of the setting for the layout. As I sit here with Autumn settling in around me, the trees are changing colour but not in the way they do in the location that I am trying to capture but I have been noting and grabbing some pics as a sort of reference, yes I know I don’t need to leave the comfort of my armchair but it helps to have reference even if only for future projects. So I have been concentrating on looking for locations via the wonders of online mapping services that will conjure up a shoreline with small towns and small trains and by that I mean not half mile long ones. I have plenty of saved images of proto short trains saved from image archives my favourite being nerailorg

With the width of the boards being eighteen inches I have some space to have a life away from the tracks and although the buildings in HO are going to be fairly big I have to see what fits in that space even if I have it as low relief but the trees are going to be an important feature.

The basic plan is for two industries yet to be decided, and then two exchange or interchange? tracks nearest to us where freight is swopped to another railroad yet to be decided also, yes its all pretty much up in the air at the moment as I would like to base the location on somewhere semi prototypical although I am not adverse to completely free styling it. And finally a possible loco servicing point on the nearest track at the far left. Maybe I should have jotted this on the sketch 🙂

The plan is to use Peco code 83 flexi and a mixture of #6’s for the main and #5’s for the yards and the crossover for the industries which will be hand built on PCB ties. For the moment the switches will all be hand operated and I am considering either complete hand operated or under board rodding with operation from both sides but not sure about the knobs sticking out but will wait to see when I get there although thinking about it it would save leaning over scenery etc.

For the moment that’s all and tomorrow I will have the track plan finalised and printed out for when the boards are complete and I have the board legs to stand it all on, although the bulk of modelling is probably going to take place on the kitchen table board by board. Till then..

Rrrrr rr restart!

Ok so I can come off the naughty step, take the dunces hat off and take the walk of shame back to the land of mojo. I really hadn’t realised it had been so long since my last post and that this blog has been running since 2013 with virtually no progress concrete or other wise modelling going on. However that is all about to change he said and in this one post I am going to re-ignite the flames of progress and get back to that fifteen minutes (at least) a day as proclaimed in the title of this blog.

When I set out and started my blog having seen many others extolling the virtues of a small chunk of time a day set aside for modelling or hobby time I decided that this would get me going and banish the analysis paralysis that had plagued me. As a very settled some might say stuck armchair modeller I got my enjoyment out of the endless planning and noodling and virtual modelling allowed via computer driven simulator sessions. I have in the past started many projects that with good intentions never quite manage to get beyond the embryonic stage, don’t get me wrong I have modelled for others completing the task(s) adequately but when it comes to my own work I seem to have a mental block. However with all that said I/we are here for a fresh start and a new start it is as I have taken up an idea that kind of popped in there whilst I was least expecting it.

What is that idea I hear you ask. Well the genesis for it started back last year well I was reading this thread and had a kind of “Uhh-huh” moment and then again it was cemented when I was visiting a friend and the discussion got to his US layout. I had remembered that  hidden in the railway boxes were some HO Kato Geeps and mentioned to my friend that this might be an interesting idea to design a HO shelf layout for him based on an L to start with. Coming away I didn’t give it much thought and it wasn’t till I travelled down to see him again with said locos that the itch that needed scratching returned. He was taken with  those smooth running locos and the leap to HO was made. Then time went by as we pasted ideas and plans backwards and forwards, again the planning stage engaging me with the creative juices flowing on what we could achieve. But this was on someone else’s layout not my own. Through various events over the last few years organising my modelling has been somewhat difficult and this has been the main reason why things have not progress in any kind of fashion however that is about to change. It was a kind of light bulb moment for me when I realised that the best way forward would be a modular layout that could be moved at short notice if needs be and that could be adaptable to the space it lives in. I’m not sure if it will ever leave here but having read about modular meet ups it does sound fun, but that is someway off in the distance.

So to a bit of background for this latest attempt. HO; check, US; check, New England; check, Fall colours; check. Yes I know nothing original here and the majority of UK modellers will either model NE or Desert railroads but for me it is the greenness of New England that resonates with my British sensibilities and I also want to sneak a covered bridge in at some point. I have deliberately kept the modules small and at 30″ x 18″ they are more manageable and will fit into our little Ford easily. I have been also thinking about the scenery and more to come on that as and when I get that far.

So till next time..

img_1712

Hammertime

Ok after a frustrating couple of days and a plan not coming together I have decided to ditch my lightweight baseboard (well I thought it was so) as the flex is just too much even with more screws although I have not glued it on so I made the decision to scrap it and start again. There is no shame in doing this in my view as to recognise the error and rectify saving time and money it is far better than doggedly follow a plan that ultimately ends in failure and loss of mojo in my case.

So how do I move forward? There is always a way out and a cloud with a silver lining and all those other cliques abound and that route was found in the form of a Vid on TrainmastersTV if you have been there roll on over and take a look. There is much content that is informative and although the bulk of it is US centric ‘we’ can learn from all modellers and techniques and there  are meany things on there that i had no or little knowledge of but have been educated.

One of the episodes is about modular board building and this is what I am going to adopt as my process. The questions then arise shall I build modular and do a couple of boards rather than one monolithic one.. a bit of pondering needed before I set off to lumber merchants once again..

hamertime

Out with the old

P4.1: Mini Challenge

Image

Whilst rummaging around at the top of the house I came across these items and thought ahh something to challenge me until I get my modelling kit back from storage. So this looks like the start of Project 4.

The location is New England, the period; current, and the scale obviously N. The Peco track if code 55 and I have no switches which makes it rather limited. So in the spirit of days gone by I am going to see if I can build some from PCB and some home made gauges using templates printed out from Templot. My idea is of a shortline with a couple of industries along it that are currently serviced by VRS. Maybe in the future they will get there own leased loco and have a nice respray. I particularly like the covered bridges of NE so will be looking to incorporate one of these and seeing as most of Vermont’s industries are based around timber there will probably be a sawmill.

The beginnings are in the baseboard and think I am going to keep it small 4-5 feet long by 12 inches wide, probably. I have my eye on an old home made table tennis table thats made out of 9mm ply. Once I have got the go ahead to dismantle I then have to work out how to cut and fear I may have to use hand saws which when cutting sheet materials is not a good mix with me as I can cut as straight as a bendy inner tube! Am going to have to see what power tools I can find in the house!

Wombling here we come.

Newer posts »